Steel Fabrication and Erection in Phoenix, AZ

One company from the shop floor to the topped out frame. Tighter coordination, fewer handoffs, predictable schedules.

From the Shop Floor to the Final Connection

Holly Steel does not hand off after fabrication. The same company that cuts, drills, and welds the steel in the shop also sends crews to the site to set it, bolt it, and weld the final connections.

Working with a single team from shop to structure means tighter coordination on sequencing, faster answers to field questions, and no finger pointing when something needs to be adjusted in place.

Steel is loaded out of the shop in the order the field crew needs it. Members arrive staged for the lift, not stacked at random in the laydown yard. That alone keeps days off the schedule on tight commercial sites.

Once the structure is up, our crew stays through the punch list. Plumb checks, torque verifications, and any remaining field welds are completed before we turn the frame over to the next trade.

Ironworker bolting a steel beam in place on a Phoenix commercial jobsite

Crews, Cranes, and Field Coordination

Erection is a logistics problem as much as a steel problem. We bring trained crews, coordinated lifts, and a safety culture that the rest of the site can build around.

  • Shop fabricated steel delivered in erection sequence
  • Certified ironworkers and AWS qualified field welders
  • Crane and rigging coordination managed by Holly Steel
  • Daily safety briefings and pre lift reviews
  • Punch list resolution and turnover support on every project

Field Safety as a Baseline

Daily JSAs

Every crew starts the day with a job safety analysis specific to the lifts and connections planned for that shift.

Qualified Riggers

All lifts are planned, signaled, and rigged by qualified personnel who walk through the lift before steel goes in the air.

Fall Protection

Crews work in full fall protection above trigger heights, with anchorage planned into the structure from the first lift.

Erection FAQ

We coordinate cranes, rigging, and signal personnel as part of our erection scope. On most projects we work with a preferred crane partner, but we can integrate with a GC supplied crane when required.

Need a Steel Crew on Site?

Send the structural set, the site address, and the target erection window. We will respond within one business day.

Request a Quote
Call Now
Request a Quote